For Bitcoin miners and hosting operators
GPUs for miners moving into AI.
You already have the power, the sites, and the operations team. Add AI capacity with used H100 and H200 servers from data center refreshes, and inspect them before you pay.
We reply within one business day.How buying works
Why Miners get deals done here
Put your power to work
Use the sites and power contracts you already have for AI and HPC hosting, with servers from data centers that are upgrading.
Complete servers
Source whole HGX servers and the networking for them, not loose cards you'd have to build systems around.
Checked both ways
Every seller goes through KYC, and you inspect the units before any money moves.
What they buy
- HGX H100 servers
- HGX H200 servers
- A100 servers
- Full racks
- Networking
How it works
- 01
Tell us what you need
Model, quantity, configuration, and where the hardware will be used.
- 02
Get checked
KYC, confirming the end user, and export screening. Sellers go through KYC too.
- 03
Inspect, pay, ship
Inspect the units, pay, and the hardware ships to you.
Hardware we close deals on
NVIDIA
B300
- Architecture
- Blackwell Ultra
- Memory
- 288 GB HBM3e per GPU
- Form factors
- SXM (HGX)
NVIDIA
B200
- Architecture
- Blackwell
- Memory
- 180 GB HBM3e per GPU
- Form factors
- SXM (HGX)
NVIDIA
H200
- Architecture
- Hopper
- Memory
- 141 GB HBM3e
- Form factors
- SXM, NVL (PCIe)
NVIDIA
H100
- Architecture
- Hopper
- Memory
- 80 GB (SXM, PCIe), 94 GB (NVL)
- Form factors
- SXM, PCIe, NVL
NVIDIA
A100
- Architecture
- Ampere
- Memory
- 40 GB or 80 GB
- Form factors
- SXM, PCIe
And more
L40S, GB200 and GB300 NVL72 racks, AMD MI300X, and every other model.
See all GPUs
Plus whole servers and the networking that goes with them.
Questions people ask
Can Bitcoin mining sites run AI servers?
Often, with upgrades. An eight-GPU HGX H100 server draws about 10 kW and needs data center cooling and high-speed networking, which most sites add when they convert.
Can old mining GPUs be used for AI?
Rarely. Consumer cards from GPU mining don't have the memory or interconnect most AI work needs. Data center GPUs like the H100 and A100 do.
Why buy used servers instead of new?
Used servers cost less than new and can often be running sooner, so new capacity comes online before a new order would ship.
Can GPUs be sold to buyers outside the US?
Often, yes, depending on the destination and the end user. US export rules restrict where advanced GPUs can go, so every deal has a confirmed end user, screened against those rules, before any money moves.