For neoclouds, AI factories, and research labs
GPUs in weeks, not months.
New GPU orders can take months, and much of the stock out there passes from broker to broker. Tell us what you need and we'll match you with vetted sellers of secondary GPU servers.


New request for price
32× H200 SXM
Ships from EU · Matches your request

New request for price
8× HGX H100 servers
Ships from US
One supplier or several? Use us as a second source.
Already buy from one supplier? Keep them, and call us when you need more GPU servers or a faster answer.
Vetted sellers only.
Every seller is checked before we match you.
Fewer hands in between.
We go to sellers who have it ready, not the next broker.
One team, start to finish.
Matching, checks, paperwork, and delivery in one place.
How it works.
Three steps. We handle everything in between.
- 01Tell us what you needModel, quantity, and timing.
- 02We match you to vetted sellersAgreements, buyer and seller qualification, offers and terms, purchase order, and OEM approval.
- 03We handle the deal end to endExport and compliance, logistics, colocation and deployment, warranty and support, and payment.
Four checks on every deal
- KYC
- Export and sanctions screening
- Hardware and serial verification
- NDA and terms
Hardware we source
- Every GPU model
- HGX and DGX servers
- Networking
Who sources here
The deal
- Every buyer and every destination is screened against export-control and sanctions lists before the hardware moves.
- We reply within one business day.
Models we work with
- NVIDIA B300Blackwell Ultra, 288 GB
- NVIDIA B200Blackwell, 180 GB
- NVIDIA H200Hopper, 141 GB
- NVIDIA H100Hopper, 80 or 94 GB
- NVIDIA A100Ampere, 40 or 80 GB
- NVIDIA L40SAda Lovelace, 48 GB, and the L40
- NVIDIA GB200 NVL72Liquid-cooled rack, 72 Blackwell GPUs
- NVIDIA GB300 NVL72Liquid-cooled rack, 72 Blackwell Ultra GPUs
- AMD MI300XCDNA 3, 192 GB
- NVIDIA RTX PRO 6000Blackwell Server Edition, 96 GB
- NVIDIA L4Ada, 24 GB, 72 W
- NVIDIA T4Turing, 16 GB, 70 W
- NVIDIA V100Volta, 16 or 32 GB
- NVIDIA A40Ampere, 48 GB, PCIe
- NVIDIA A10Ampere, 24 GB, and the A10G
- NVIDIA RTX A6000Ampere, 48 GB
- NVIDIA RTX 6000 AdaAda Lovelace, 48 GB
- NVIDIA GH200Grace Hopper Superchip
- NVIDIA 8-GPU HGXH100, H200, B200, or B300 nodes
- 4-GPU serversHGX or PCIe
- NVIDIA DGXA100 through GB300
- AMD MI325XCDNA 3, 256 GB
- AMD MI355XCDNA 4, and the MI350
- AMD MI210 / MI250CDNA 2, and the MI250X
- Intel Gaudi 2 / 3OAM, Gaudi 2 or Gaudi 3
Tell us what you need.
Model, quantity, timing, and where the hardware will be used.
Questions people ask
Where can I buy used H100s or A100s?
Here. Tell us the model, how many, and where the hardware will be used, and we'll match you with sellers in our network.
Is the hardware new or used?
Mostly used and surplus hardware coming out of data centers. New, unused units come up too. We collect which it is before we bring it to buyers.
Why do you need to know who will use it?
Sellers and export rules both require it. Every deal has a confirmed end user before any money moves.
Is inspection part of every deal?
No. The two sides can agree to an inspection when they set the terms. It is not included on every deal. Tell us what you want checked, and we carry that with the deal.
Can I buy if I'm outside the US?
Often, yes, depending on the destination and the end user. Every buyer and every destination is screened against export-control and sanctions lists before the hardware moves.
Are these complete 8-GPU servers?
Not always. The hardware can be a complete 8-GPU server, loose GPUs, or a full rack, including a liquid-cooled NVL72 rack. We collect which one it is before we bring it to buyers.
Where do they ship from, and does the date mean ready to ship or delivered?
Ship-from is collected for each deal. There is no single origin for every deal. We also collect whether each date means ready to ship or delivered, before the deal moves forward. One date does not stand for both. On some deals the buyer and seller run logistics directly. On others we coordinate it when asked.
Can you share the full BOM including cooling, power and networking?
Yes. Before we bring it to buyers, we collect what comes with the hardware: whole servers or loose GPUs, cooling, power, networking, switches, racks, and PDUs. Ask, and we share what we collected.
Are switches, cables, racks and power distribution included?
Sometimes. Switches, cables, racks, and PDUs are included on some deals and separate on others. We collect which before we bring it to buyers.
Do you have US colocation partners?
The hardware does not include a colocation site. When a buyer wants US colocation or help standing the hardware up, we collect the power, the cooling, and the site they have in mind, and carry that request with the deal.
Can transfer approval and warranty be confirmed in writing?
Before the deal moves forward, we collect whether warranty and support can be confirmed in writing. Many deals also need the OEM's sign-off on the transfer.